Showing posts with label Birse Coastal. Show all posts
Showing posts with label Birse Coastal. Show all posts

Monday, 3 March 2014

Friends of Redcar Beach Action Group March 2014




The place was Redcar Beach, to the left of the Redcar Regent Cinema. Our challenge to build a big "Rubble Sandcastle" out of the building material we could find much of it left behind and buried during the Coastal Defences work last year by Birse Coastal (now Balfour Beatty Construction UK) 



Following our rally call we gathered a hardy bunch of volunteers. Thanks guys you were great as always. We're always so inspired by these local residents who give up their Sunday morning to help their community.


It was a cracking morning and we got straight down to it. Amongst the usual bricks and masonry we also found large boulders of slag from British Steel and high volumes of half buried building felt and material. Unfortunately this stuff we couldn't move.


While we were at it we had a peak around the other side of the cinema too and it was equally as bad. Lots of building material impossible to shift without lifting equipment.



We weren't just there to shift rubble. Through their hard work the volunteers collected around 15 bags of litter.


As the time kicked on our rubble castle grew


And grew


And grew - Not entirely sure what was going on here? Trying to smuggle rubble off the beach? :D






After just an hour and a half we had our "Rubble Sand Castle". Imagine what 50 or 100 volunteers could shift in that time? We can but dream. 

Why not join us next time. On Saturday 5th April we'll be at the Caravan Park end of Majuba working our way down to the bandstand.




Friday, 15 November 2013

Birse attacks back on Redcar Beach


The gloves are off! Well actually they're on as Birse Civil get into action on Redcar beach. Friends of Redcar (FRED) are pleased to announce that following our plea and voluntary efforts to remove rubble on Redcar beach that the contractor Birse Civil have come back and carried out their own sweep.

Rubble and  material collected by Birse Civil 
Over a couple of days in November, Birse Civil managed to remove tons of rubble that would have taken the community action group much longer.


FRED would like to publicly thank Birse Civil for listening to their concerns that rubble buried during the installation of the new Coastal Defences has been resurfacing due to dissipating sand and movement of the sea. FREDs concern is that the rubble remaining is detrimental to tourism and residents alike who will not use a beach that is dangerous and visually unpleasing.



Carl Quartermain Chairman of Friend said "I am very pleased that common sense has prevailed. I've been in contact with Simon Kirtlan the Project Manager of the Flood Alleviation Scheme in Redcar for Birse and thanked him for his efforts to help our seaside town improve its image. 

"However, the rubble is still horrendous and likely to turn up for years. I did wonder if 'Atonement 2' was about to be made because it looks like a war-zone, particularly around the cinema where the original movie was filmed

"I have requested that Birse come back in the Spring and that we build an event around this which includes Redcar and Cleveland Borough Council (RCBC) and FRED.

"Nobody would employ a contractor into their home and allow them to leave rubbish and debris on their property without permission. My concern is RCBC have done exactly that which isn't in the interest of Redcar's residents and businesses who have to live with the knock-on consequences.

"Less visitors equal less trade, it's that simple. Utilising our own council's maintenance team to clean up over the years, effects our council tax and resources which could be used on other eyesores such as Locke Park, Kirkleatham or any overgrown waste land.

"Residents and businesses who care about their area must get involved. I'd request the council review tendering and land management policies to include independent inspections with resident groups who can oversee unused, demolished or recently constructed ground within their ward and ensure they are managed conscientiously by the landowner, whether private or public, with repercussions for failure. 

"Cleared building sites shouldn't be allowed to remain fenced off, broken up and overgrown for months and even years and action needs to be taken to stop these magnets for fly tipping and anti-social behaviour."

Thanks to Simon Kirtlan of Birse for these picture and for listening to the concerns 

FRED continually campaigns for the removal of masonry on Redcar beach and carries out events to remove litter all year round. If you would like to become involved contact friendsofredcar@gmail.com and search on facebook and twitter.

Links:
http://www.thenorthernecho.co.uk/news/10801093.Redcar_beach_an__eyesore__after___30m_regeneration_project/
http://www.theeyemagazine.co.uk/2013/11/08/friends-redcars-fight-rubble-continues/

Wednesday, 6 November 2013

Birse Inspection of Redcar Beach Rubble




Following our Beach Action Group complaints regarding the masonry left behind by Birse Civil on Redcar Beach, Friends of Redcar (FRED) was invited to inspect the beach by James Mead of the Environmental Agency accompanied by a Simon Kirtlan project manager of Birse Civil and Darren Edmunds of Redcar and Cleveland Borough Council (RCBC) on the 24th October 2013.

We made it clear from the off that we were under no illusion that the rubble that is turning up along the coastal defences is debris buried by Birse and now re-emerging due to the movement of the sea and the dissipation of the sand. We also presented them with a sample of masonry containing polypropylene fibres, continually turning up along the defences, from the new build.

Varieties of rubble mostly from the destruction of the last sea front that was buried and not disposed of in a landfill


Polypropylene filled masonry used in the building of the Flood Alleviation project.


The inspection covered the Coatham area from the Beacon to the TunedIn building and did not take into consideration the associated problem at the Zetland end of the beach. FRED recognise that not all the rubble is from the Coastal defences work and have maintained that large pieces of weathered rubble further out on the petrified forest and scars have been there for years and should be dealt with by RCBC.

(We will be working with the council to remove these boulders over the next year following our plans to schedule litter/masonry picks to specified locations and times). (http://friendsofredcar.blogspot.co.uk/2013/10/redcars-beach-rubble-problem-old-and-new.html)

However, the debris next to the coastal defences is not tidal wash. FRED insists that this IS Birse's responsibility because the broken masonry was buried there by them and now they should 'hold their hands up' and bring in clear-up teams. This includes both the Coatham and Zetland areas of our beach that now resemble landfill and cleared building sites. FRED has requested that a channelled trough of at least 6x6 and probably wider, be dug into the sand along the Coastal Defences and that the sand be sieved and returned - rubble free.

Left to Right: (Just out of shot) Simon Kirtlan (Birse -Project Manager), Darren Edmunds (RCBC liaison) James Mead (Environmental Agency - Project Manager) behind a trailer full of debris collected next to the new defences within a two hour period.
During the inspection the Birse project manager rarely spoke or offered much in the way of an explanation. However, James Mead of the Environmental Agency and project manager over the Birse Coastal contract informed us that Redcar beach already looked "as bad as this when the work began". He went to add that much of the rubble was washed in by the tide. Both these claims were refuted by FRED as well as council employees whose work has included cleaning the beach for years.  James Mead stated rubble was "inert" from an environmental point of view and made it clear that removing sand to be cleaned, was not an option and that at best, Birse would do a couple more sweeps in light of the complaint.

FRED have accepted Birse's (EA's) offer to provide a couple of sweeps and have requested they come back in the Spring too and to provide dates for these actions. We are yet to receive dates for these sweeps or any information of follow up work carried out by them.

However we feels that this is wholly inadequate and stated this on the day.



"In light of the overwhelming evidence, the detrimental visual image and the safety issues to beach-goers, I can't help but feel insulted and even trivialised. I've used the beach for 25 years and for the best part it is now a hideous eyesore along the coastal defences steps." said Carl Quartermain, Chairman of Friends of Redcar. "I have written to the Operations Director of the Regeneration Scheme RCBC saying that this is just not good enough and that the council must do more to bring about a resolve.

"I not only feel a deep lack of concern by the Environmental Agency and a loud silence from Birse but also a reluctance by Redcar and Cleveland Borough Council to bring the contractor to task for this unsatisfactory clean up. Redcar beach will be turning up this stuff for years and yet RCBC leaders don't seem to be forcing Birse to sort it out. Why?

"It's difficult to understand. If I was in a position of authority in the council I'd jump all over this. Our coastline is our greatest asset and what's happened is inherently bad for the town.

"In any case, regardless of the fact that this year was a chance to show off our new £30 million sea front and facilities, regardless of the fact that Redcar suffers economically and regardless of the efforts to bring in visitors by providing new events, the bottom line is that this is our home and our beach and our council is allowing outside agencies to come in and leave an unforgivable mess that will impact on us for decades."



Linked to

Redcar Flood Alleviation Scheme Complaint Part.One
Redcar Flood Alleviation Scheme Complaint Part.Two
Redcar Flood Alleviation Scheme Complaint Part.Three
Redcar's Beach Rubble Problem Old and New

FRED would like to thank Anna Turley (Labour and Co-operative candidate for Redcar) Merily McGivern (Lib Dem) John Colling (RCBC Neighbourhood Maintenance team) Mark Skidmore (FRED committee member) for their attendance and support.


If you feel strongly about this issue and would like to be involved, below are some relevant email addresses. The RCBC have assured FRED that they respond to all concerns.

gary.flynn@redcar-cleveland.gov.uk is the Regeneration Operations Director for RCBC

james.mead@environment-agency.gov.uk is the project manager for the EA

simon.kirtlan@birse.co.uk is the project manager for Birse Civil.

darren.edmunds@redcar-cleveland.gov.uk liaison officer for RCBC

george.dunning@redcar-cleveland.gov.uk leader of RCBC

ian@ianswales.com is the MP for Redcar

Relevant councillors :-
Irene Curr and Josie Crawford (Coatham Ward)
Ron Harrison and Josh Mason (Zetland Ward)

If you would like to become a member and follower of FRED check out the following links:

http://friendsofredcar.blogspot.co.uk/2013/10/fred-exclusive-membership-club-details.html
http://friendsofredcar.blogspot.co.uk/2013/08/social-media-were-all-over-it.html

or write to friendsofredcar@gmail.com



Monday, 14 October 2013

Redcar's Beach Rubble Problem Old and New



Since we began this “crusade” of removing rubble from our beach following the building of the new coastal defences and striving to get the Environmental Agency and Birse to come back to clean up, one of the criticisms we get is that masonry has been on the beach for decades and that no matter how often we remove rubble it will keep coming back.


We disagree. If material does comes back why does it strategically form only along the new defences? If it is cleaned up we don’t believe it would come back in any great volume or size. The rubble that continually is revealed is the stuff that had been buried old and new next to the defences when the new work was built.

So is there old rubble on the beach from previous developments? Short answer to that is YES. Of course there is. We have never disputed that old rubble has been on the beach for years. And it ain’t pretty! There is lots of old rubble of different shapes and sizes, age and variety. However the amount has multiplied drastically since the work, making it all much more noticeable and undesirable.


There are differences between old and new fabrication that has been exposed to the elements. We have seen so much of it now we could probably start a course on marine rubble. If we had the money to waste we could also examine the varieties and complete an historical survey of the many surfaces that have been used on Redcar's sea front. We haven’t got funds to waste on trivia, but our common sense tells us much of the rubble that is visible, is new.

Not all of it is broken up concrete either. Some of the rubble is house bricks or different types of paving for example. There’s many difference sizes, style and colours, old and new. Further out away from the sea defences are examples of masonry that have been weathered, eroded and shaped over time by the thrashing of the waves.

Selection of Redcar beach rubble. Some are shaped from years on the coast. Other pieces are clearly newly formed.

Commonly formed concrete rubble that has been subjected to the elements for years tends to become darker, often brownish and can be stained with marine growth if static for long enough. It is often shaped and rounded. These examples in Redcar are large boulders that have been in the sea for many years and are 'our' responsibility to remove if we want a beach clean of these eyesores.


Old stained rubble with kelp accessories not far from the Redcar Beacon


Marine life existent on static rubble too heavy to be moved by the sea


Browned and ancient rubble on the petrified forest

This massive piece is next to the Dundas Street slipway (No it isn't a rock!)

The new rubble that has recently been formed and which dwarfs what was originally on our beach, looks clean and often reveals reinforced lengths of polypropylene, used on the new and previous development. This stuff is found next to our sea defences and logically can only be from the installation of the new and the demolition of the old sea defences last year (2012). This same material can be seen on the runaway going down to the beach from Dundas Street and on the bottom few steps along the seaward side of the seawall. Closer scrutiny and you can see the identical fibres protruding where the edges have been damaged.






We are asking that the Environmental Agency come back and do a clean of the areas around the sea defences that are littered with masonry. They state they did a thorough clean up and this rubble was either washed in or has always been there. Our answer to that is if they cleaned up properly the old rubble would have gone with this new stuff. We believe lots of this debris was buried and is subsequently being uncovered by the natural shifting of sand and movement of the sea.




If we recognise this as a problem now, we could easily arrange to get this shifted before the next summer season and visitor attraction campaigns begin. We are waiting for a date when the Environmental Agency will invite us along to carry out an inspection and continue to inform Redcar and Cleveland Borough Council of our information and concerns.

Links:
http://friendsofredcar.blogspot.co.uk/2013/09/redcar-flood-alleviation-scheme_27.html

Credits:
Thank you for all the photos. We have many on our system now and will show the many that haven't been published yet. Thanks also to Fred Brunskill for the additional information regarding the polypropylene fibres.

Sunday, 6 October 2013

Friends of Redcar Beach Action Group October 2013


A very mild and sunny day in October and a good reason to get on the beach to collect up more of that masonry left over from the Coastal Defences Regeneration work. 

And the proof is in the pictures. The 3 mounds of rubble displayed in the photos were created in just 2 hours with a handful of people. (Just imagine what could be achieved).


Undoubtedly there is rubble and brick in amongst that collected that has been on our beach for decades. However as I said in my response to the Environmental Agency, who claim no responsibility, if their clean up had been thorough much of the old rubble would have gone with the new debris we have found.

New rubble to big and deep to be removed by hand


Scarlett working hard to dig this rubbish up
 We heard lots of complaints from residents who have said they have written to council members and their MP and are either met with closed replies or no reply at all and that no one is picking up this issue.

We advise residents that the matter lies not with the MP or the council but with the Environment Agency, and we are in contact with our council demanding that the clean up needs revisiting. 

It is the EA who oversaw this project by Birse Coastal and now claim they have no responsibility to the debris left behind (It's washed in and always been there apparently).

We collected and created 3 large mounds of rubble. Well done Scarlett

The concerns are apparent and therefore we ask you to write to your Redcar councillors, Environmental Agency and Ian Swales MP to help us highlight a genuine problem that residents shouldn't have to deal with. Just send the link to our posts and tell them what you think.

Ian Swales MP states that his office responds to all queries regarding beach rubble addressed by constituents. These concerns are passed to the council, into whose remit the management of the Birse contract falls. Ian himself has participated with a beach clean up event by FRED. The council are also concerned that locals feel angered and state they will reply to any complaint. They too are eager to confirm that they work with FREDs beach actions

Before I sign off I'd like to say a big thank you to Denise Thompson and little Alfie McKenna who came to their first litter pick today and worked hard to show residents what we are fighting against. A beach that looks in part like a cleared building site.

Our beach clean ups will be every first Sunday of each month. Next one will be a litter pick on the Stray, meeting at Zetland roundabout at 10am on the 3rd November tide permitting. See you there?

Our next open meeting is 6:30pm at the Palace Hub on the 17th October - tea and coffee provided. Come along it's about your home - Redcar.

Thanks everyone and join our club  (just sign up and look for "Friends of Redcar")




Links:

http://friendsofredcar.blogspot.co.uk/2013/09/redcar-flood-alleviation-scheme_27.html
http://www.environment-agency.gov.uk/contactus/default.aspx
http://ianswales.com/en/survey/ask-ian
http://www.redcar-cleveland.gov.uk/Councillors
https://www.streetclub.co.uk/clubs/home


Friday, 27 September 2013

Redcar Flood Alleviation Scheme Complaint Part.Three


Hi all,

Over the past few days I have been bringing you up to speed with our complaint regarding the brick and rubble on our beach in Redcar. For consistency please follow the links back to the original thread. (See Redcar Flood Alleviation Scheme Complaint Part.One and  Redcar Flood Alleviation Scheme Complaint Part.Two)

The letter below is our reply to an Environmental Agency that doesn't feel they have any responsibility to the building debris left on our beach. Above and below are the new photos sent to accompany this email.

Enjoy.


Dear Gemma,

Thank you for your assistance in bringing us a reply to our complaint. Thank you also to Mr. James Mead the Project Manager for his reply and courteous invitation to inspect the beach area with the contractor next month. We (Friends of Redcar) would accept this offer to make our case. Thank you also for the distance photo shot of Granville Terrace that does indeed appear to show red brick on the left although difficult to make out anything more. 

We, wholeheartedly disagree with Mr. Mead that the materials left over has "nothing to do with our works" and cannot agree that they "ensured that the material dug up from under the beach was removed" - certainly not thoroughly enough as described.

We would concede that naturally over the many years and developments/demolitions, that material would have "washed in and out", been buried and re-emerged and in any case building material would certainly have been evident next to the old defences, prior to the new coastal defences being installed. We would not dispute that in any way. However, please consider that;

- Much of the building debris remaining is not weathered or shaped (rounded) as would be expected from material that had been left to the elements for years. 
- This is clean looking rubble and very similar in appearance along the entire stretch. We have seen "old" rubble too but not as much.
- The sheer weight of some of this debris would not suggest it had just washed in recently along the whole length of the defences after the builders departed and without being noticed. In such case there would surely be evidence of scattered debris all over the beach too. There is debris further out but is isolated to one particular area which is rocky.

By Mr. Mead's admission they did a "thorough" clean up and "ensured the material dug up from under the beach was removed". So are we therefore to assume that the jagged, clean masonry running the length of the new coastal defences, that we're speaking of, is "material washing in and out"? Well not necessarily because we are provided that picture of Granville Terrace which shows "a number of bricks" of which the contractor "cannot accept responsibility". So this is confusing. Is this new material washed up or old material already there? According to Mr. Mead both, but no way has anything to do with the construction work or the "thorough" clean up.

 The "thorough" clean up Mr. Mead describes seems to therefore discriminate against any previous masonry that was found. That during their "thorough" clean up, the contractor carefully manoeuvred passed or turned a blind eye to the bricks and rubble already there, carefully examining what was theirs and what was not their "responsibility". Ensuring that they only cleared away their own mess. How "thorough" does that clean up sound? 

Personally, I used to fit bathrooms and kitchens. When I finished I would clean up and hose down outside removing all rubbish and debris. Inside I would wipe everything down, polish it up and vacuum up and down the stairs. I would insist. And yes that would include mess I never made. Why? Because I took pride in my work and wanted to impress my customer. It was the professional and conscientious thing to do. And very much appreciated.

We disagree with and disapprove of Mr. Mead's response of what has been left and that he feels no responsibility. We are convinced that not only did the contractor leave the "nothing to do with our works" but also added to it. Perhaps our beach doesn't matter to the contractor or the pride they take with their clean up, but it does to the people of Redcar and to our tourism. 

Furthermore we're not sure why a clean up would come from "public money" and not from the contractor's purse? With respect who is Mr. Mead to speak for the public by suggesting that this is not an efficient use of money? Ask the people of Redcar and indeed any coastal town if they'd like a clean beach and we can assure you the answer would be in the affirmative. Two JCBs, three employees, our volunteers, three to five large skips and a days work to polish off a great job, is hardly going to scratch the £30 million project.

We have just had our first summer with these fabulous new sea defence in place and yet the number of complaints received about the beach resembling a building site far outweighs the complimentary comments about the work. Was that the contractor's intended legacy and public opinion?

 I have attached two more photos. The bricks and rubble displayed do not appear to be weathered from decades in the sea and were found beside the new defences. We are positive that these pieces along with the 4.5 tons our volunteers have already cleared along the defences since August this year, were left after the contractor finished working there. There simply is no other explanation and to deny this is insulting.

 We look forward to going along to inspect the area when a date is set and having extra help to remove the remaining debris.

Once again thank you Gemma,


Yours respectfully,


Carl Quartermain 

Chairman of a Friends of Redcar and on behalf of all our beach users.



If you would like to contact the Environmental Agency or the contractor to make your own point here are their details below. If you require the contact details of any of the Redcar Officials please let us know and we'll happily forward them. Thanks

Tel: 0191 203 4105 (Internal 728 4105)
Fax: 0191 203 4004

Environment Agency
Tyneside House
Skinnerburn Road
Newcastle Business Park
Newcastle upon Tyne

Wednesday, 25 September 2013

Redcar Flood Alleviation Scheme Complaint Part.Two


Hi all,

Following on from our original complaint (See Redcar Flood Alleviation Scheme Complaint Part.One) Below is an email we received on the 23rd September 2013 from the Environmental Agency. Mr James Mead is the project manager for the Environmental Agency who oversees the contractor's work. Above is the picture sent with this email to display that bricks were already on the beach prior to work commencing. I have replied and will show this in a new blog (Part.Three) shortly. Enjoy


Dear Carl


Thank you for your enquiry, received in this office on 12 September 2013. I have consulted James Mead who was the Project Manager for the scheme. James has made the following comments

We are confident in our contractor that they were very thorough in cleaning up during and after the sea defence works along Redcar Sea front. Further inspections were carried out as areas of work were completed to ensure no materials were left over from our works and we ensured that the material  dug up from under the beach was removed and the sand placed back where we had been.

We cannot accept responsibility for materials that are nothing to do with our works, I attached a photograph of Granville Terrace before we started work which shows the stones and shingle at the top of the beach with a number of bricks visible amongst them. The photographs taken recently do not look dissimilar to this. This we would suggest is as a result of many years of materials washing in and off the seafront and not as a result of our recent works. Re-mobilising our contractor to carry out such a beach clearance for the small quantities of materials highlighted does not seem like an efficient use of public money.

That said we are happy to check the beach once again, when we return to site next month to install the second sculpture, to satisfy all parties that  we haven’t missed anything. We would be happy for you and representatives from the council to join us on such an inspection. We will be in touch when our contractor has confirmed the timing of this visit.

I attach a copy of our "Notice" which sets out the various uses to which Environment Agency information and data can be put.
If you require any further assistance on this or any other environmental matter please don’t hesitate to contact us.
Kind regards
Gemma Alecks
Customers and Engagement Officer



So what do you think? If you would like to contact the Environmental Agency regarding this matter or have any other concerns below are their contact details.

Tel: 0191 203 4105 (Internal 728 4105)
Fax: 0191 203 4004

Environment Agency
Tyneside House
Skinnerburn Road
Newcastle Business Park
Newcastle upon Tyne
NE4 7AR

Thursday, 12 September 2013

Redcar Flood Alleviation Scheme Complaint Part.One





Hi all, 

To keep everyone up to speed with our Beach Action Group complaint regarding building debris on the beach and our endeavour to bring the contractor (Balfour Beatty - Birse Civil) back to clear up the rubble, below is the initial email, links and photos sent to the Environmental Agency and Birse Civil. 

We have received replies from the Environmental agency (See Redcar Flood Alleviation Scheme Complaint Part Two) but sadly not a single reply from any of the Redcar officials copied into this post. 

We believe our beach is worth investment as part of a process to attract visitors and holiday makers onto the beach (in their swimming costumes!) and to change the perceptions that prevents Redcar becoming a viable holiday resort like Scarborough and Whitby. 

Enjoy and look out for the updates 









Dear Sir/Madams,

I represent a community action group in Redcar called "Friends of Redcar" (FOR) and am writing this email on behalf of our committee, residents and visitors of Redcar. 

For transparency I have copied into this post; Balfour Beatty (Birse Civil); the FOR committee; Zetland and Coatham councillors and neighbourhood teams; Ian Swales - MP for Redcar, George Dunning - Leader of Redcar and Cleveland Borough council (RCBC) and Vic Jeffries - Mayor. (*Please can you assist us by forwarding this email to any relevant department/persons and/or replying with appropriate advice, protocols and actions.)

We were advised to contact the Environment Agency due to our concerns over the amount of building debris remaining on our beach following the Redcar Flood Alleviation Scheme Spring 2012. We are hopeful that the Environment Agency can clearly steer us towards the correct course of action.

I have also sent a copy of this email to:-
Birse Civil Head Office 2200 Century Way, Thorpe Park, Leeds LS15 8ZB

We would draw your attention to the following links in support of our concern. I have also attached some photographs.


It is our belief that we have building debris all along our coastline because the beach was not cleaned up thoroughly after the coastal defence work was completed. We believe the responsibility for carrying out a thorough clean up of the beach area, all along the new coastal defences and in part further out where large pieces of rubble have been found, lies with Balfour Beatty (Birse Civil) who carried out the work, along with any inspection team who signed the work off (if indeed it has been signed off.)

We have been advised by RCBC that they are, or will be, in contact with Birse Civil (Tel: +44 (0) 113 821 3400) to get action and will keep our group informed of developments. Representatives from our group will gladly assist in highlighting and removing these unsightly and often dangerous reminders of our old defences.

We very much look forward to receiving your response and to find a way forward so that as a group we can concentrate our efforts on lifting litter off our beach and not masonry. Thank you.


Best regards,

Carl Quartermain 
Co-Founder and Chairman of Friends of Redcar on behalf of all our beach users.




If you would like to add your own comments for the Environmental Agency office in Newcastle and Balfour Beatty Birse Civil office - here are their contact details. Please do let us know how that communication goes.

Email: Gemma Alecks Customers and Engagement Officer
Mr. James Mead (Project Manager)
0191 203 4105
northeast-newcastle@environment-agency.gov.uk

2200 Century Way
Thorpe Park
Leeds
LS15 8ZB
Tel: +44 (0) 113 821 3400

If you require the contact details of any of the Redcar Officials please let us know and we'll happily forward them. Thanks

This series continues here:
Redcar Flood Alleviation Scheme Complaint Part.Two
Redcar Flood Alleviation Scheme Complaint Part.Three
Redcar Flood Alleviation Scheme Complaint Part.Four